There are currently no Alerts at Eve. Call 1800 920 062 (our 24/7 Hotline) to report a Fault or Outage.
About Us
Residential
Business
Network
To assist us to provide you with services, we need to collect personal information about you. We will treat your information in accordance with our privacy policy, a copy of which is available upon request. If you have Life Support equipment at your home or premise, we want to ensure that you will be safely connected and understand how to register, so please call us on 08 9416 2026.
A Permanent Supply Connection Application will be processed against the Applicant details provided below.
You can nominate an (or another) Authorised Builder or Electrical Contractor to engage with us in relation to establishing this Permanent Supply Connection, including us providing details about the Permanent Supply Connection.
This is the intended address you want to establish the Permanent Supply Connection for. The land titles must be released, and the address provided must match the titles according to the shire or Landgate. If the property is, or will be strata titled, please provide the parent lot number on this application, or refer to the City of Wanneroo for more information.
This section is intended to understand the supply you will require at the Permanent Supply Connection Address.
Please provide details for each significant piece of equipment to be installed at the premises.
Select the items you are providing with this application.
Please read Conditions of request to provide a formal quote below.
By signing this form, you are confirming that all the information in Parts 1 - 7 above is accurate and true, and you understand that a Permanent Supply Connection will be created, and subsequent Permanent Supply Connection activities will occur, and you agree to the terms provided here in this form in Part 7 & 8, in addition to the terms of EVE’s Standard Form Contract, as approved by the Economic Regulation Authority from time to time, except to the extent otherwise agreed. You understand that a Connection Invoice (and a Design Invoice should this be non-standard, and applicable to your request) will be issued to you following this Supply Form application submission, and that the invoice/s require full payment before any connection activities will be undertaken; additionally, all required electrical notices are to be received by Eglinton Village Energy prior to the commencement of connection activities. You understand and agree that the completion of your connection will be actioned within 8 weeks from the invoice/s payment and the required electrical notice/s receival. We will contact you if the application requires further information. Should the invoice/s payment and the required electrical notices not be received, your Supply Form application will be cancelled, and we will notify you.
*No obligation to proceed
Submission of a new Temporary Supply Connection application does not oblige you to proceed with a new Temporary Supply Connection and the associated electricity infrastructure works unless you accept EVE’s formal quote.
*Large Connections
If your connection will have a total maximum load greater than 1,000kVA or 10% of the relevant systems peak load, EVE reserves the right to amend these terms and conditions or impose new conditions in connection with your Connection Application. Eve will need to apply the Customer Connections and Contribution Guidelines to the new connection.
*Design Fee
A formal quote is free of charge for connections that have a total maximum demand of 5 kVA or less. A design fee is payable for connections with a total maximum load of more than 5 kVA or connections which will require a CT Meter. The Design Fee is specified in the Fees and Charges section of EVE’s Customer Connection and Contribution Guidelines which you can request a copy of, from our Customer Service Team. EVE shall issue you with a tax invoice for the Design Fee (if applicable) after EVE received the completed New Electricity Connection Application form from you. EVE will only commence preparation of the detailed design and formal quote when this fee (if applicable) is paid. Cost of the Design Fee may increase if the actual costs incurred by EVE in preparing the detailed design and formal quote exceed the design fee, the difference will be incorporated in the formal quote and will be payable by you in accordance with the terms and conditions attached to the formal quote.
*Design fee non-refundable
The Design Fee is not refundable, even if you decide not to engage EVE to proceed with the electricity infrastructure works.
*Additional charges
EVE may impose an increase to charges or impose new charges in accordance with the Customer Connection and Contribution Guidelines and will do its best to ensure that you are provided with prompt notice of any such increases or new charges.
*Statutory approvals and clearances
You are responsible for obtaining any statutory approvals in relation to the proposed electricity infrastructure works at your own cost, including planning approval and approvals in relation to heritage, Native Title, Aboriginal heritage, flora and fauna, or any vegetation clearances from the appropriate government body or agency.
*New Connection arrangements are separate to electricity supply arrangements
If you accept the formal quote, this does not address the requirement to have an electricity supply agreement in place in relation to the supply of electricity at the premises. Except to the extent that you have already made arrangements for the supply of electricity to the premises, EVE will provide you with an offer to supply electricity at the premises along with the formal quote.