There are currently no Alerts at Eglinton Village. Call 1800 920 062 (our 24/7 Hotline) to report a Fault or Outage.

Navigation

Self Supply Application

Please use this form to apply for a new Eglinton Village Energy (Eve) Self Supply Application, or an upgrade to an existing system.

Once submitted, your nominated installer will be contacted separately to provide the technical system details required to complete the assessment.

The full process typically takes around 4 weeks from initial application through to finalisation, depending on how quickly all required information is provided.

You can download all Application Process documention below for more information.

Your application will involve you agreeing:

  • to sell your surplus electricity to Eve and permit the management and control of your system under the EVE Distribution Energy Offtake Agreement; and
  • that your system and connection will be designed, installed, operated and maintained in accordance with Eve’s Customer Self Supply Guidelines, Customer Connections & Contributions Guidelines and Service and Technical Installation Rules.

EVE (Eglinton Village Energy) Self Supply Process Map

Download

EVE (Eglinton Village Energy) Distributed Energy Offtake Agreement

Download

EVE (Eglinton Village Energy) Customer Self Supply Guidelines

Download

EVE (Eglinton Village Energy) Customer Connection and Contribution Guidelines Residential

Download

ZCE (Zenith Connected Energy Microgrids) Service and Technical Installation Rules

Download

EVE (Eglinton Village Energy) Approved Inverter Make & Model List

Download
Customers initiate the application process and then Solar Installers will be invited by Eve thereafter to submit the next round of application information.

Before starting, make sure you know whether this application is for a new embedded generation system or a modification to an existing embedded generation system. You’ll be asked to provide details about your embedded generation system and installer so we can assess your connection requirements. Some embedded generation systems may need to meet specific technical standards or have export limits applied. If you’re unsure, check with your installer before proceeding.

Note: All fields must be completed. Please fill the information in CAPITAL letters.
Application Type 

Customer Details

Eglinton Village Energy (Eve) Account Number

Enter the Eglinton Village Energy (Eve) Account Number linked to the property where the system will be installed. This helps us identify the correct connection point. You can find your Eve Account Number on the front page of your bill, in the top right corner. Note: If your Retailer is not Eve, please contact your Retailer direct to initiate this process.

Supply Address

Provide the installation address for the system. Make sure this matches the supply address registered with your electricity provider. Note: Your Supply Address can be found on the front page of one of your bills

Supply Address
Installer Business Name

Enter the name of the company responsible for installing the system. This should match the business registered for the installation.

Installer Email Address

Provide the installer’s email address so we can send important updates and reference details if required.

Installer Phone Number

Enter a contact number for the installer in case additional information or clarification is needed.

Inverter Capacity (kVA)

Specify the total inverter capacity of the system in kVA. This determines how much power the system can convert for use or export. Note: Speak with your Installer before providing this information. Note: The maximum inverter capacity at Eglinton Village is 10kVA.

PV Panels Capacity (kW) if applicable

Enter the total generation capacity of the solar panels in kW. Only include this if solar PV is part of the system. Note: Speak with your Installer before providing this information.

Battery Capacity (kWh) if applicable

Provide the usable storage capacity of the battery system in kWh. Only required if a battery is being installed. Note: Speak with your Installer before providing this information.

Customer Application Declaration & Authorisation

By submitting this application, I acknowledge and agree that:

*The information I have provided is true, accurate and complete to the best of my knowledge at the time of submission.

*I am the account holder under an electricity supply agreement with Eve for the nominated property.

*I am the owner of the premises or have the authority of the owner of the premises to make this application.

*I have nominated the installer listed in this application and authorise them to act on my behalf to provide additional information and progress this application where required.

*I understand that my installer may be required to supply further technical details and documentation to support this application.

I have read and accepted Eve’s Distribution Energy Offtake Agreement where this application relates to a residential solar generation system that may export electricity to the Eve network. I understand that those terms include management and control arrangements that are crucial to any incoming installation, including Eve’s ability to manage export, apply export limits, curtail output or otherwise control the system in accordance with those terms and that this may limit my use of the system accordingly. I also acknowledge that:

*My system must comply with all relevant technical and connection requirements, including the Customer Self Supply Guidelines, the Customer Connections & Contributions Guidelines, the Service and Technical Installation Rules and any applicable standards for system size, export limits, and remote management capabilities.

*Depending on the system configuration, export limitations or control requirements (such as emergency management or network control) may be applied.

*Failure to meet these requirements may impact the ability to connect, operate, or receive benefits from the system.

I understand that:

*Additional works (such as meter reconfiguration or upgrades) may be required to enable connection and may incur costs and/or temporary interruptions to supply. Should this be applicable, you will be notified.

*This application is subject to assessment and approval, and further information may be requested.

Please confirm the following: 
Your browser does not support the Signature field
Name